REVOLVE has received the order for the revamp of an existing EGSB reactor at a paper mill in Germany.

A paper mill in Germany has contracted Revolve to revamp its existing EGSB reactor. The goal: stop the loss of anaerobic granular sludge, bring the reactor back to stable operation and end the costly routine of buying in new biomass.
The challenge
The reactor was losing its anaerobic granular sludge. Operation became unstable, and the mill had to buy and add new granular sludge again and again. Load that the anaerobic stage no longer removed passed on to the downstream aerobic treatment, driving up costs there as well. A Revolve ValueScan located the source of the sludge loss and defined a targeted fix of the EGSB settler.
Our approach
The reactor had to be taken out of operation for the works, and the mill could not afford a long stop. The key was preparation: the intervention was engineered and planned in detail before the reactor came offline, so the time on site was spent only on execution. The works were completed in under two days. A shutdown of the mill was avoided and the reactor is up and running again.
Next steps
Revolve stays involved after the revamp. Through its Performance Guidance Plan, Revolve will follow up the reactor and optimise its performance further, keeping the granular sludge where it belongs: in the reactor.